ARKTIS.GROUP
← Realizacje
Produkcja automotive DE · 2023

Audi / Volkswagen Group Ingolstadt

Ingolstadt, Germany

Kraj
Germany
Rok
2023
Brygada
4–8 specialists
Czas
4–8 weeks

Zakres

Electrical and controls installation: control cabinets, PLC/HMI wiring, robotic-cell connections and sealer/material-handling line support. The crew wired and connected the robotic and material-handling equipment to OEM standards and supported testing.

Wyzwanie

Precise integration of robotic equipment and controls within strict OEM production standards required careful wiring, checking and documentation of every cell connection.

Rola ARKTIS

Electrical and controls installation crew for the robotic and material-handling equipment, executing to the OEM design and supporting the controls integration.

/ rezultat

The robotic and material-handling equipment was connected and prepared for testing and commissioning.

Potrzebujesz podobnej realizacji?

Podaj kraj, zakres i termin — odpowiemy w 48 godzin.