ARKTIS.GROUP
← Realizācijas
Automotive ražošana DE · 2023

Audi / Volkswagen Group Ingolstadt

Ingolstadt, Germany

Valsts
Germany
Gads
2023
Komanda
4–8 specialists
Ilgums
4–8 weeks

Apjoms

Electrical and controls installation: control cabinets, PLC/HMI wiring, robotic-cell connections and sealer/material-handling line support. The crew wired and connected the robotic and material-handling equipment to OEM standards and supported testing.

Izaicinājums

Precise integration of robotic equipment and controls within strict OEM production standards required careful wiring, checking and documentation of every cell connection.

ARKTIS loma

Electrical and controls installation crew for the robotic and material-handling equipment, executing to the OEM design and supporting the controls integration.

/ rezultāts

The robotic and material-handling equipment was connected and prepared for testing and commissioning.

Vajag līdzīgu izpildi?

Pasakiet valsti, apjomu un laiku — atbildēsim 48 stundu laikā.