ARKTIS.GROUP
← Références
Intralogistique · e-commerce US · 2026–2027 · à confirmer

Walmart Fulfillment Center

Kings Mountain / Charlotte area, NC, USA

Pays
USA
Année
2026–2027
Équipe
6–12 specialists (to confirm)
Durée
2–4 months (to confirm)

Scope

Probable scope: electrical installation for fulfilment-centre automation — power distribution, conveyors, equipment connections and commissioning support. Exact scope to be confirmed against internal records.

Défi

A new large-item fulfilment operation with high-throughput automation and a demanding ramp-up will require the electrical works to keep pace with a fast equipment-installation programme.

Rôle ARKTIS

Probable electrical installation subcontractor role supporting the automation package; to be confirmed with internal records.

/ résultat

Fulfilment systems would be prepared for operational launch; the exact result is to be confirmed.

FAQ

Quels types de projets avez-vous réalisés ?+

Des lots électriques, mécaniques, d’automatisation et de mise en service sur data centers, usines EV et automobiles, centres de distribution automatisés, salles blanches et grues portuaires — pour Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz et Audi.

Pouvez-vous fournir des références ?+

Nos études de cas citent clients, sites et périmètres. Sur demande et dans le respect de la confidentialité, nous pouvons détailler des projets pertinents et vous mettre en relation lorsque le client l’autorise. Le capability pack offre un aperçu plus complet.

Comment les projets sont-ils documentés ?+

Chaque projet est livré avec les enregistrements QA/QC, journaux d’installation et plans as-built attendus par votre réception. Nous travaillons dans votre GED et vos conventions de nommage pour un bouclage prêt pour l’audit.