ARKTIS.GROUP
← Projektid
Intralogistika · e-kaubandus US · 2026–2027 · kinnitada

Walmart Fulfillment Center

Kings Mountain / Charlotte area, NC, USA

Riik
USA
Aasta
2026–2027
Meeskond
6–12 specialists (to confirm)
Kestus
2–4 months (to confirm)

Maht

Probable scope: electrical installation for fulfilment-centre automation — power distribution, conveyors, equipment connections and commissioning support. Exact scope to be confirmed against internal records.

Väljakutse

A new large-item fulfilment operation with high-throughput automation and a demanding ramp-up will require the electrical works to keep pace with a fast equipment-installation programme.

ARKTIS roll

Probable electrical installation subcontractor role supporting the automation package; to be confirmed with internal records.

/ tulemus

Fulfilment systems would be prepared for operational launch; the exact result is to be confirmed.

KKK

Milliseid projekte olete teostanud?+

Elektri-, mehaanika-, automaatika- ja kasutuselevõtu töid andmekeskustes, EV ja autotehastes, automatiseeritud jaotuskeskustes, puhtaruumides ja sadamakraanadel — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ja Audi.

Kas saate esitada referentse?+

Meie juhtumiuuringud loetlevad kliendid, asukohad ja mahud. Soovi korral ja konfidentsiaalsust arvestades arutame projektide detaile ja ühendame teid, kui klient lubab. Capability pack annab põhjalikuma ülevaate.

Kuidas projekte dokumenteeritakse?+

Iga projekt antakse üle QA/QC kirjete, paigalduslogide ja teostusjoonistega, mida vastuvõtt ootab. Töötame teie dokumendihaldussüsteemis ja nimekonventsioonides, et lõpetamine oleks auditivalmis.

Vajate sarnast teostust?

Öelge riik, maht ja aeg — vastame 48 tunni jooksul.