ARKTIS.GROUP
← Références
Data center DE · 2021–2022

Vantage Data Centers

Berlin, Germany

Pays
Germany
Année
2021–2022
Équipe
8–16 specialists
Durée
3–6 months

Scope

Data centre MEP and electrical installation across critical-power and distribution systems — MDP/SDP panels, UPS, ATS, standby generators, cable containment and BMS/EPMS — through to commissioning support. Crews installed, terminated and tested the power chain to the project specification and kept the installation records current for each system as it was handed to commissioning.

Défi

Hyperscale data centre delivery leaves no margin on critical-power reliability, safety or commissioning. Every system had to be installed and documented to pass strict QA and EHS gates before it could move forward in the commissioning sequence.

Rôle ARKTIS

Electrical and MEP installation subcontractor supporting the critical-infrastructure works under the main delivery package, executing to the client design and integrating with the wider site programme rather than acting as designer.

/ résultat

Electrical and critical-power systems were installed, tested and documented ready for data-hall commissioning and phased capacity delivery, with the QA/QC trail closed out alongside the physical work.

Besoin d’un scope similaire ?

Indiquez pays, scope et timing — réponse sous 48 heures.