Scope

Electrical installation for cloud data-centre infrastructure: power distribution, UPS/ATS, standby generation, cable containment, BMS/EPMS and server/network white-space fit-out. The crew scaled across multiple buildings as the region expanded, holding a consistent installation and documentation standard across each phase.

Défi

Mission-critical cloud infrastructure carries strict reliability, security and handover-documentation requirements, and the work continued across an expanding multi-building campus where every phase had to match the same acceptance criteria.

Rôle ARKTIS

Electrical installation subcontractor for data-centre power and fit-out systems, working under the main contract to the client specification and aligning to site security and access controls throughout.

/ résultat

Critical infrastructure was prepared for commissioning and operational handover across the initial build and subsequent expansion phases, with a repeatable installation and QA standard carried between buildings.