ARKTIS.GROUP
← Case studies
Automotive manufacturing DE · 2016

Audi Neckarsulm

Neckarsulm, Germany

Country
Germany
Year
2016
Team
6–10 specialists
Duration
2–3 months

Scope

Electrical installation of production systems: cable trays, power and signal cables, communication networks, LV cabinets, lighting, UPS and grounding. The crew installed the full plant electrical scope and prepared it for acceptance.

Challenge

A complex plant installation spanning multiple electrical disciplines came with tight OEM documentation requirements, so every discipline had to be installed and recorded to the plant’s acceptance standard.

ARKTIS role

Electrical installation subcontractor for the production and plant systems, executing to the client design across the LV, communication and grounding scopes.

/ result

The electrical systems were installed and prepared for plant acceptance, with documentation aligned to OEM requirements.

Need a similar scope executed?

Tell us the country, scope and timing — we come back within 48 hours.