ARKTIS.GROUP
← Referenties
Intralogistiek · e-commerce US · 2026–2027 · te bevestigen

Walmart Fulfillment Center

Kings Mountain / Charlotte area, NC, USA

Land
USA
Jaar
2026–2027
Ploeg
6–12 specialists (to confirm)
Duur
2–4 months (to confirm)

Scope

Probable scope: electrical installation for fulfilment-centre automation — power distribution, conveyors, equipment connections and commissioning support. Exact scope to be confirmed against internal records.

Uitdaging

A new large-item fulfilment operation with high-throughput automation and a demanding ramp-up will require the electrical works to keep pace with a fast equipment-installation programme.

ARKTIS-rol

Probable electrical installation subcontractor role supporting the automation package; to be confirmed with internal records.

/ resultaat

Fulfilment systems would be prepared for operational launch; the exact result is to be confirmed.

FAQ

Wat voor projecten heeft u uitgevoerd?+

Elektrische, mechanische, automatiserings- en inbedrijfstellingsscopes op datacenters, EV- en autofabrieken, geautomatiseerde distributiecentra, cleanrooms en havenkranen — voor o.a. Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz en Audi.

Kunt u referenties geven?+

Onze case studies vermelden klanten, locaties en scopes. Op verzoek en met inachtneming van vertrouwelijkheid bespreken we relevante projectdetails en brengen we u in contact waar de klant dit toestaat. De capability pack geeft een vollediger overzicht.

Hoe worden projecten gedocumenteerd?+

Elk project wordt opgeleverd met de QA/QC-records, installatielogs en as-built redlines die uw acceptatie verwacht. We werken in uw documentbeheersysteem en naamgevingsconventies zodat de afsluiting audit-klaar is.

Een vergelijkbare scope nodig?

Geef land, scope en timing — reactie binnen 48 uur.