ARKTIS.GROUP
← Pakalpojumi

/ pakalpojumi

Ārkārtas mobilizācija

Aizvietošanas brigādes un grafika atjaunošana 3–7 dienās.

Pieteikt šo pakalpojumu

Ko mēs piegādājam

Reactive mobilization for schedule recovery, replacement of an underperforming subcontractor and unplanned scope — from signed scope to a crew on site within 3–7 days, anywhere in the EU. When a date is slipping or a subcontractor has walked, we move fast: a crisis manager scopes the situation, we agree rate and compliance in hours rather than weeks, and we mobilize a crew matched to the work with their compliance pack already in order. From the first day we run daily reporting so you regain visibility and control of the recovery, and we document everything to the same standard as a planned scope so the rushed work still closes out cleanly.

Kur mēs iederamies

Direct under the main contractor or owner. We absorb scope quickly, work to whatever design and drawings exist, and document everything — we do not attempt engineering recovery or redesign. Our job is to stabilise the programme and hold the date while your team resolves the root cause.

Dokumenti, ko piegādājam

  • – Pre-mobilization document pack
  • – A1 + posted-worker pack
  • – HSE plan + RAMS
  • – Daily reporting from day one
  • – QA/QC records to planned-scope standard

Komandas struktūra

  • – Crisis manager
  • – Site supervisor
  • – Crew matched to scope

Piemērots

  • – Schedule recovery
  • – Replacement of an underperforming subcontractor
  • – Unexpected scope additions
  • – Holding a critical-path date under pressure

Ārpus apjoma

×Engineering recovery (we execute against existing design)
×Root-cause and commercial dispute resolution

FAQ

Cik ātri jūs reāli esat objektā? +

3–7 dienas pēc apjoma saskaņošanas, visā ES, ar pilnu atbilstības un dokumentu paketi — nevis solījums izskatīt, bet brigāde objektā.

Vai varat pārņemt no cita apakšuzņēmēja darba vidū? +

Jā. Apsekojam izbūvēto, pārņemam atvērto apjomu un punch punktus un turpinām pēc esošā projekta, atjaunojot dokumentācijas pēdas no pārņemšanas punkta.

Vai ārkārtas darbi tiek dokumentēti pēc tā paša standarta? +

Jā. Reaktīvie apjomi joprojām saņem RAMS, HSE, ikdienas atskaites un QA/QC ierakstu kopu, tāpēc ātra mobilizācija nenozīmē netīru noslēgumu.

Vajag šo pakalpojumu?

Pieteikt šo pakalpojumu