ARKTIS.GROUP
← Paslaugos

/ paslaugos

Skubi mobilizacija

Pakeitimo brigados ir grafiko gelbėjimas per 3–7 dienas.

Užsakyti šią paslaugą

Ką pristatome

Reactive mobilization for schedule recovery, replacement of an underperforming subcontractor and unplanned scope — from signed scope to a crew on site within 3–7 days, anywhere in the EU. When a date is slipping or a subcontractor has walked, we move fast: a crisis manager scopes the situation, we agree rate and compliance in hours rather than weeks, and we mobilize a crew matched to the work with their compliance pack already in order. From the first day we run daily reporting so you regain visibility and control of the recovery, and we document everything to the same standard as a planned scope so the rushed work still closes out cleanly.

Kur tinkame

Direct under the main contractor or owner. We absorb scope quickly, work to whatever design and drawings exist, and document everything — we do not attempt engineering recovery or redesign. Our job is to stabilise the programme and hold the date while your team resolves the root cause.

Dokumentai, kuriuos teikiame

  • – Pre-mobilization document pack
  • – A1 + posted-worker pack
  • – HSE plan + RAMS
  • – Daily reporting from day one
  • – QA/QC records to planned-scope standard

Komandos struktūra

  • – Crisis manager
  • – Site supervisor
  • – Crew matched to scope

Tinka

  • – Schedule recovery
  • – Replacement of an underperforming subcontractor
  • – Unexpected scope additions
  • – Holding a critical-path date under pressure

Ne apimtyje

×Engineering recovery (we execute against existing design)
×Root-cause and commercial dispute resolution

DUK

Kaip greitai realiai esate objekte? +

3–7 dienos nuo apimties suderinimo, visoje ES, su pilnu atitikties ir dokumentų paketu — ne pažadas pasidomėti, o brigada objekte.

Ar galite perimti iš kito subrangovo darbo viduryje? +

Taip. Apžiūrime tai, kas pastatyta, perimame atvirą apimtį ir punch punktus ir tęsiame pagal esamą projektą, atkurdami dokumentacijos pėdsaką nuo perėmimo taško.

Ar avariniai darbai dokumentuojami pagal tą patį standartą? +

Taip. Reaktyvios apimtys vis tiek gauna RAMS, HSE, kasdienę atskaitomybę ir QA/QC įrašų rinkinį, todėl greita mobilizacija nereiškia netvarkingo užbaigimo.

Reikia šios paslaugos?

Užsakyti šią paslaugą