WITRON / EDEKA Nord
Neumünster, Germany
Maht
Electrical installation for a fully automated grocery distribution centre: OPM/COM order-picking machines, stacker cranes, conveyor systems and IT/control integration, with ongoing maintenance support. Crews wired and connected the automation equipment and supported integration with the WITRON control platform across a multi-year build.
Väljakutse
A large grocery DC with high case-picking capacity, many stacker cranes and an integrated WITRON IT platform demanded precise electrical integration across hundreds of equipment interfaces, sustained over a multi-phase delivery.
ARKTIS roll
Electrical installation and integration-support crew for the automated warehouse systems, executing to the integrator’s design and coordinating with the mechanical and controls packages on site.
/ tulemus
The automated distribution systems were connected and supported toward mid-2025 operational start-up, with the crew retained for integration and maintenance support through the ramp-up.
/ rohkem
Rohkem sellest sektorist
KKK
Milliseid projekte olete teostanud?+
Elektri-, mehaanika-, automaatika- ja kasutuselevõtu töid andmekeskustes, EV ja autotehastes, automatiseeritud jaotuskeskustes, puhtaruumides ja sadamakraanadel — Vantage, AWS, Equinix, WITRON/EDEKA, BMW, Mercedes-Benz ja Audi.
Kas saate esitada referentse?+
Meie juhtumiuuringud loetlevad kliendid, asukohad ja mahud. Soovi korral ja konfidentsiaalsust arvestades arutame projektide detaile ja ühendame teid, kui klient lubab. Capability pack annab põhjalikuma ülevaate.
Kuidas projekte dokumenteeritakse?+
Iga projekt antakse üle QA/QC kirjete, paigalduslogide ja teostusjoonistega, mida vastuvõtt ootab. Töötame teie dokumendihaldussüsteemis ja nimekonventsioonides, et lõpetamine oleks auditivalmis.
Vajate sarnast teostust?
Öelge riik, maht ja aeg — vastame 48 tunni jooksul.